You are hired by an industry that owns a building with a floor area of 6 m by 10 m and a ceiling height of 4 m.

You are hired by an industry that owns a building with a floor area of 6 m by 10 m and a ceiling height of 4 m. The walls, floor, and ceiling are concrete 15 cm thick. Gasoline is spilled on the floor and ignites due to a worker casually lighting a cigarette. The building has a door which is 1.2 m wide by 2.5 m high.
(a) What is the energy release rate at flashover (MW)?
(b) What is the maximum area of spill (m2) if flashover is to be prevented?
Note: Perform your calculations 10 minutes after ignition and use combustion efficiency of 0.7.
2 .- A room has dimensions of 20 m by 20 m by 3.05 m high. A fire develops in the room with a constant energy release rate of 900 kW. Compute the time (sec) that it will take the smoke layer to be 1.5 m from the floor for two conditions: (a) when leakage areas are located at floor level; and (b) when the leakage is at roof level.
3. A closed room is 5 m high and contains a fire with a plume mass flow rate of 5 kg/s at a height of 2.5 m and an upper layer temperature of 400oC. There is an opening at floor level 1 m wide and 2.5 m high. Your assignment is to find the required ceiling ventilation area if the smoke is not to come closer than 2.5 m from the floor.

What Students Are Saying About Us

.......... Customer ID: 12*** | Rating: ⭐⭐⭐⭐⭐
"Honestly, I was afraid to send my paper to you, but splendidwritings.com proved they are a trustworthy service. My essay was done in less than a day, and I received a brilliant piece. I didn’t even believe it was my essay at first 🙂 Great job, thank you!"

.......... Customer ID: 14***| Rating: ⭐⭐⭐⭐⭐
"The company has some nice prices and good content. I ordered a term paper here and got a very good one. I'll keep ordering from this website."

"Order a Custom Paper on Similar Assignment! No Plagiarism! Enjoy 20% Discount"