Workers need to enter a below-ground, concrete-lined vault to repair a leaking valve that controls the flow of wastewater from several buildings at your plant

Workers need to enter a below-ground, concrete-lined vault to repair a leaking valve that controls the flow of wastewater from several buildings at your plant. The opening for the pit is outdoors and secured with a 36-inch diameter manhole cover. The pit is 12 feet deep, and the walls are 6 feet x 6 feet wide. The valve is at the bottom of the vault. You opened the cover, tested the atmosphere, and found oxygen levels to be at 16%. No toxic substances were detected. After ventilating the space for 15 minutes, the oxygen reading reached 18% and remained at that level.
Address the following items:
Using the flow chart in Appendix A of 29 CFR 1910.146, determine the classification of the space.
Explain how you reached the decision.
Based on your determination, develop an OSHA-compliant standard operating procedure (SOP) for workers to follow when entering the space to repair the valve. Include the citation(s) from 29 CFR 1910.146 for each step of the procedure.
Your submission must be a minimum of two pages in length (double-spaced). Be sure to include a title page.

To Appendix A of 29 CFR 1910.146
https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9798

Number of Pages: 2 Pages
Page Line Spacing: Double spaced (Default)
Deadline: 2 days
Academic Level: College
Paper Format: APA

Running Head: UNIT IV CASE STUDY 1

UNIT IV CASE STUDY 3

Unit IV Case Study Your name Columbia Southern University Date Class

Introduction

Findings

Recommendations

Fault Finding

Conclusion

References

National Safety Council, (2009). Supervisors’ safety manual. Itasca, IL: National Safety Council

 

Submit Your Assignment and get professional help from our qualified experts!


Workers need to enter a below-ground, concrete-lined vault to repair a leaking valve that controls the flow of wastewater from several buildings at your plant was first posted on July 8, 2019 at 12:14 pm.
©2019 “Submit Your Assignment”. Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at support@nursingassignmenttutor.com


Workers need to enter a below-ground, concrete-lined vault to repair a leaking valve that controls the flow of wastewater from several buildings at your plant was first posted on July 8, 2019 at 12:15 pm.
©2019 “Custom Essay Writers“. Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at support@cheapcustomwriting.com

What Students Are Saying About Us

.......... Customer ID: 12*** | Rating: ⭐⭐⭐⭐⭐
"Honestly, I was afraid to send my paper to you, but splendidwritings.com proved they are a trustworthy service. My essay was done in less than a day, and I received a brilliant piece. I didn’t even believe it was my essay at first 🙂 Great job, thank you!"

.......... Customer ID: 14***| Rating: ⭐⭐⭐⭐⭐
"The company has some nice prices and good content. I ordered a term paper here and got a very good one. I'll keep ordering from this website."

"Order a Custom Paper on Similar Assignment! No Plagiarism! Enjoy 20% Discount"